PowerCenter Minitower 166 Uživatelský manuál Strana 10

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 62
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 9
NCS Technologies, Inc. New Catalog
TC-6
TERMS AND CONDITIONS APPLICABLE TO PURCHASE OF
GENERAL PURPOSE COMMERCIAL INFORMATION TECHNOLOGY EQUIPMENT
(SPECIAL ITEM NUMBER 132-8)
1. MATERIAL AND WORKMANSHIP
All equipment furnished hereunder must satisfactorily perform the function for which it is intended.
2. ORDER
Written orders, EDI orders (GSA Advantage! and FACNET), credit card orders, and orders placed under blanket purchase agreements (BPA) agreements shall be the basis for purchase in
accordance with the provisions of this contract. If time of delivery extends beyond the expiration date of the contract, the Contractor will be obligated to meet the delivery and installation
date specified in the original order.
For credit card orders and BPAs, telephone orders are permissible.
3. TRANSPORTATION OF EQUIPMENT
FOB DESTINATION. Prices cover equipment delivery to destination, for any location within the geographic scope of this contract.
4. INSTALLATION AND TECHNICAL SERVICES
a. INSTALLATION. When the equipment provided under this contract is not normally self-installable, the Contractor's technical personnel shall be available to the ordering
activity, at the ordering activity's location, to install the equipment and to train ordering activity personnel in the use and maintenance of the equipment. The charges, if any, for such services
are listed below, or in the price schedule:
None
b. INSTALLATION, DEINSTALLATION, REINSTALLATION. The Davis-Bacon Act (40 U.S.C. 276a-276a-7) provides that contracts in excess of $2,000 to which the United
States or the District of Columbia is a party for construction, alteration, or repair (including painting and decorating) of public buildings or public works with the United States, shall
contain a clause that no laborer or mechanic employed directly upon the site of the work shall received less than the prevailing wage rates as determined by the Secretary of Labor. The
requirements of the Davis-Bacon Act do not apply if the construction work is incidental to the furnishing of supplies, equipment, or services. For example, the requirements do not
apply to simple installation or alteration of a public building or public work that is incidental to furnishing supplies or equipment under a supply contract. However, if the construction,
alteration or repair is segregable and exceeds $2,000, then the requirement of the Davis-Bacon Act applies.
The ordering activity issuing the task order against this contract will be responsible for proper administration and enforcement of the Federal labor standards covered by the Davis-Bacon Act.
The proper Davis-Bacon wage determination will be issued by the ordering activity at the time a request for quotations is made for applicable construction classified installation, deinstallation,
and reinstallation services under SIN 132-8.
c. OPERATING AND MAINTENANCE MANUALS. The Contractor shall furnish the ordering activity with one (1) copy of all operating and maintenance manuals which are
normally provided with the equipment being purchased.
5. INSPECTION/ACCEPTANCE
The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The ordering activity reserves the right to inspect or test any equipment that has
been tendered for acceptance. The ordering activity may require repair or replacement of nonconforming equipment at no increase in contract price. The ordering activity must exercise its
post acceptance rights (1) within a reasonable time after the defect was discovered or should have been discovered; and (2) before any substantial change occurs in the condition of the item,
unless the change is due to the defect in the item.
6. WARRANTY
a. Unless specified otherwise in this contract, the Contractor’s standard commercial warranty as stated in the contract’s commercial pricelist will apply to this contract.
[NOTE: Please refer to the pricelist for the description of the warranty for each item.]
b. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
c. Limitation of Liability. Except as otherwise provided by an express or implied warranty, the Contractor will not be liable to the Government for consequential
damages resulting from any defect or deficiencies in accepted items.
d. If inspection and repair of defective equipment under this warranty will be performed at the Contractor's plant, the address is as follows:
NCS Technologies, Inc.
7669 Limestone Drive
Gainesville, Virginia 20155-4038
7. PURCHASE PRICE FOR ORDERED EQUIPMENT
The purchase price that the Government will be charged will be the Government purchase price in effect at the time of order placement, or the Government purchase price in effect on the
installation date (or delivery date when installation is not applicable), whichever is less.
8. RESPONSIBILITIES OF THE CONTRACTOR
The Contractor shall comply with all laws, ordinances, and regulations (Federal, State, City or otherwise) covering work of this character, and shall include all costs, if any, of such
compliance in the prices quoted in this offer.
Zobrazit stránku 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 61 62

Komentáře k této Příručce

Žádné komentáře